Packages

Infrastructure

Showing 1-6 of 6 packages

Infrastructure, illustrative photo

Make the case for public works.

Business cases, delivery-model options and asset-planning support for roads, utilities, ports and energy infrastructure.

Clear filter

Search & sort

Infrastructure Business Case, illustrative photo

01 · Infrastructure

Infrastructure Business Case

A structured business case for a public or private infrastructure project.

Stage
Plan
Format
Analysis + report + workshop
Typical timeline
6-8 weeks

We prepare a business case that sets out the need, options considered, costs, benefits, risks and delivery approach in the format funders usually look for. Analysis uses public data and the project information you supply. The package fits a single project of moderate size.

Deliverables
Business case document (40-60 pp), options analysis, cost and benefit tables, executive summary
Best for
Municipal, Indigenous and private proponents seeking funding or approval
Pricing basis
Fixed fee from C$10,400; about 56 hours at a blended C$185/h; excludes HST; estimate, confirmed in writing
Not included
Engineering design, traffic or condition surveys, formal value-for-money sign-off, legal opinion

fromC$10,400

Delivery Model & P3 Options Assessment, illustrative photo

02 · Infrastructure

Delivery Model & P3 Options Assessment

A comparison of traditional and alternative delivery models for an infrastructure project.

Stage
Structure
Format
Analysis + report
Typical timeline
5-6 weeks

We compare design-bid-build, design-build, and P3-style models for your project on risk allocation, cost certainty, financing and procurement effort. A high-level value-for-money view is included, based on your inputs and public benchmarks. The package informs a decision; it is not a formal value-for-money report.

Deliverables
Options assessment report, risk allocation matrix, high-level comparison model
Best for
Public bodies and sponsors choosing how to deliver a larger project
Pricing basis
Fixed fee from C$8,900; about 48 hours at a blended C$185/h; excludes HST; estimate, confirmed in writing
Not included
Engineering design, traffic or condition surveys, formal value-for-money sign-off, legal opinion

fromC$8,900

Lifecycle Cost Model, illustrative photo

03 · Infrastructure

Lifecycle Cost Model

A model of capital, operating and renewal costs over the life of an infrastructure asset.

Stage
Plan
Format
Excel model + walkthrough
Typical timeline
3-4 weeks

We build a lifecycle model for an asset such as a plant, road section or building system, using your cost data and typical service lives. The output compares options on total cost of ownership, not only up-front cost. Assumptions are listed so you can update them as better data arrives.

Deliverables
Excel lifecycle model, option comparison tab, assumptions list, short memo
Best for
Owners comparing alternatives or planning long-term renewal funding
Pricing basis
Fixed fee from C$5,900; about 32 hours at a blended C$185/h; excludes HST; estimate, confirmed in writing
Not included
Engineering design, traffic or condition surveys, formal value-for-money sign-off, legal opinion

fromC$5,900

Asset Management Plan Support, illustrative photo

04 · Infrastructure

Asset Management Plan Support

Support in preparing or updating an asset management plan for a defined group of assets.

Stage
Review
Format
Data review + workshops + plan
Typical timeline
5 weeks

We help organise asset inventories, condition data and levels of service into a plan structure, and build a simple investment-need profile by asset class. The package covers one asset group such as roads, water or facilities. Engineering condition assessments are not included.

Deliverables
Plan draft, asset inventory template, 10-year investment-need profile
Best for
Municipalities and utilities that need a clear plan for funders and council
Pricing basis
Fixed fee from C$6,700; about 36 hours at a blended C$185/h; excludes HST; estimate, confirmed in writing
Not included
Engineering design, traffic or condition surveys, formal value-for-money sign-off, legal opinion

fromC$6,700

Port & Logistics Corridor Study, illustrative photo

05 · Infrastructure

Port & Logistics Corridor Study

A study of a freight or logistics corridor and the case for investment in it.

Stage
Screen
Format
Desk research + report
Typical timeline
5-6 weeks

We map flows, bottlenecks and options along a corridor linking ports, rail, road and inland terminals, using public traffic and trade data. The study sets out where investment could help and what evidence funders would expect. It does not include traffic counts or engineering design.

Deliverables
Corridor study report, flow and bottleneck maps, investment options list
Best for
Sponsors, authorities and operators exploring logistics investments
Pricing basis
Fixed fee from C$8,100; about 44 hours at a blended C$185/h; excludes HST; estimate, confirmed in writing
Not included
Engineering design, traffic or condition surveys, formal value-for-money sign-off, legal opinion

fromC$8,100

Utility & Energy Infrastructure Screening, illustrative photo

06 · Infrastructure

Utility & Energy Infrastructure Screening

A screening of energy or utility infrastructure options against cost, siting and regulatory fit.

Stage
Screen
Format
Desk review + report
Typical timeline
4-5 weeks

We screen options such as transmission upgrades, storage, generation or district energy for a site or region on indicative cost, siting constraints and approvals. The output ranks options for deeper study. Cost figures are order-of-magnitude and are not engineering estimates.

Deliverables
Screening report, option ranking matrix, indicative cost ranges
Best for
Utilities, developers and municipalities at an early planning stage
Pricing basis
Fixed fee from C$7,000; about 38 hours at a blended C$185/h; excludes HST; estimate, confirmed in writing
Not included
Engineering design, traffic or condition surveys, formal value-for-money sign-off, legal opinion

fromC$7,000

Request

Service request

Do not include confidential documents or account numbers.